- 1. The Renewable Heat Incentive comes to a close
- (Renewable energy news from isoenergy)
- ... applicants, although those already on the schemes will continue to receive the payments for the allotted time of seven and 20 years respectively. The RHI schemes prompted a significant increase in ...
- Created on 04 April 2022
- 2. Is the Government doing enough?
- (Renewable energy news from isoenergy)
- ... would seem the CHG will provide 10% and 25% respectively at the top end of the market. Far less than the current RHI scheme. But awards companies delivering lower-cost solutions by making them too competitive ...
- Created on 10 August 2020
- 3. The Vyne - Project update March 2020
- (Project updates)
- ... used on site for the related specialist works. Both Leggat Plant Ltd and A.D Broughton will be working on the groundworks and gas work respectively as part of a team that have already worked together to ...
- Created on 23 March 2020
- 4. Heat Pump Repairs and Servicing in Somerset
- (Areas we service)
- ... are competent at carrying out remedial and service work across a wide range of manufacturers’ equipment, irrespective of size and complexity. If your system suffers a mechanical or electrical breakdown, ...
- Created on 23 October 2019
- 5. Project update – Glyn Cywarch May 2019
- (Project updates)
- ... at both ends. With the recent good weather, we have taken the opportunity to install the EnergyBlade collectors in the holding pools, which now need to be connected to their respective manifolds. The ...
- Created on 04 June 2019
- 6. Are there any renewable heat incentives available?
- (Renewable energy news from isoenergy)
- ... The RHI comes in two forms, domestic RHI and non-domestic RHI, with payments for each lasting seven and twenty years respectively. Domestic RHI payments are deemed and pay up to £4,500/year for seven ...
- Created on 17 May 2019
- 7. Solar photovoltaic mounting options
- (More information)
- ... If there is any doubt then a structural engineer will perform a survey prior to any installation. We adhere to the MCS standards in all respects and take manufacturers guidelines seriously. Whilst some ...
- Created on 25 August 2017
- 8. Another positive awards season for isoenergy
- (Renewable energy news from isoenergy)
- ... that our standing in the industry is respected by our peers as well as our clients. isoenergy was recently highly commended at the annual Renewable Energy Association (REA) Awards in the Installer o ...
- Created on 25 July 2017
- 9. Middleton Manor
- (Projects)
- ... in better pressure at all of the taps from one centralised hot water cylinder. isoenergy was asked to design a system that would respect the building and heat the section currently lived in my the owners. ...
- Created on 03 March 2017
- 10. Minafon
- (Projects)
- ... heat pump, a 1,000l litre warm water buffer tank, 1,600l of domestic hot water storage and Class A energy efficient cylinder charge pumps. isoenergy was asked to design a system that would respect the ...
- Created on 29 November 2016
- 11. Selecting a drilling sub-contract partner
- (Renewable energy news from isoenergy)
- ... Solutions. The ultimate test is, of course, the activity on the ground. In this respect, Synergy Boreholes also demonstrate an understanding of what it takes to develop and build the ground-source secto ...
- Created on 22 February 2016
- 12. Still FiT to Go!
- (Renewable energy news from isoenergy)
- ... high-utilisation sites also benefit further from having the export tariff deemed at 50% of generation, irrespective of what is actually exported. Another £700 credited to the bill each year. So in a ...
- Created on 22 December 2015
- 13. The Old Inn
- (Projects)
- ... an oil burner and a wood burning stove. A 220 litre domestic hot water tank was installed. isoenergy was asked to design a system that would respect the listed cottage and ensure it was comfortable ...
- Created on 01 October 2013
- 14. Peasmarsh Place
- (Projects)
- ... and at the same time to take advantage of Government grants. isoenergy was asked to design a system that would respect the building and heat the section currently lived in by the owners. A number of ...
- Created on 19 September 2013
- 15. St Giles House
- (Projects)
- ... solution to the property, without affecting the building or local ecosystem. isoenergy was asked to design a system that would respect the building and heat the section currently lived in my the owners. ...
- Created on 25 April 2013
- 16. Moated Manor House
- (Projects)
- A grade II listed moated manor house originally dating from 1600 with a Palladian façade added around 1710. isoenergy was asked to design a system that would respect the building and heat the section ...
- Created on 25 April 2013
- 17. Loughton Methodist Church
- (Projects)
- ... a system that would respect the building and heat the section currently lived in my the owners. A number of options were available tfor providing heating, but the near by lake was a perfec heat source ...
- Created on 30 November 2001