Need some advice? - 01293 821 345 - consult@iso.co.uk

Project specification

  • Property type: Community
  • Technologies installed:
  • Size (kW): 400
  • New/retrofit: New build

isoenergy was selected to install a biomass boiler system to provide heating throughout this new-build sports centre in Yorkshire.

Two Viessmann Pyrot 300 wood pellet boilers were installed helping the Local Authority to minimise the carbon footprint of the project.

Key features:

  • 2 x Viessmann Pyrot 300 biomass boilers
  • 4,000 litre buffer tank

Gallery

0
0
0
s2smodern

RECC      TSI     MCS Logo    5 1 small       GSHPA   Trustmark

Copyright © isoenergy 2023