Need some advice? - 01293 821 345 - consult@iso.co.uk

Project specification

  • Property type: Commercial
  • Technologies installed:
  • Collector type:
  • Size (kW): 25
  • New/retrofit: Retrofit
  • Brand: CTC

Sedlescombe Vineyard in East Sussex is an environmentally responsible, organic vineyard. When planning their new visitor centre, it made sense to look for sustainable heating options rather than burning fossil fuel to heat the building and staff accommodation.

Isoenergy installed a 25kW CTC ground source heat pump system with energy collected from 1,600m of horizontal collector array in the vineyard.

Key features:

  • 25kw CTC EcoPart i425 heat pump
  • 1,000m horizontal collector array
  • 500 litre hot water tank
  • 500 litre buffer tank

Project gallery

0
0
0
s2smodern

RECC      TSI     MCS Logo    5 1 small       GSHPA   Trustmark

Copyright © isoenergy 2023