Need some advice? - 01293 821 345 - consult@iso.co.uk

Project specification

  • Property type: Country estate
  • Technologies installed:
  • Collector type:
  • Size (kW): 153
  • New/retrofit: Retrofit
  • Brand: Viessmann

Harleyford Manor is a Grade 1 listed manor house near the river Thames. isoenergy was selected by M&E consultants E+M Technica to install a new renewable energy system for the house.

Isoenergy installed a 153kW Viessmann ground source heat pump system with energy collected from 21 boreholes.

Key features:

  • 153kW Viessmann ground source heat pump system
  • 21 x 155m borehole collector array
  • Provides heating, cooling, hot water, indoor pool water heating and heating for the Spa

Project Gallery

0
0
0
s2smodern

RECC      TSI     MCS Logo    5 1 small       GSHPA   Trustmark

Copyright © isoenergy 2023