Project specification

  • Property type: Country estate
  • Technologies installed:
  • Collector type:
  • Size (kW): 200
  • New/retrofit: Retrofit
  • Brand: EcoForest

Brandsby Hall is a Grade II listed manor house in Yorkshire. The new owners were refurbishing the house along with a stable block which was being turned into ancillary accommodation.

To heat all the buildings on site, isoenergy installed a 200kW Ecoforest ground source heat pump system. Energy for the heat pump is collected from a large horizontal collector array in a nearby paddock.

Key features:

  • 200 kW Ecoforest ground source heat pump
  • Horizontal collector array
  • 2,000 litre hot water tank