Brandsby Hall
Project specification
- Property type: Country estate
- Technologies installed:
- Collector type:
- Size (kW): 200
- New/retrofit: Retrofit
- Brand: EcoForest
Brandsby Hall is a Grade II listed manor house in Yorkshire. The new owners were refurbishing the house along with a stable block which was being turned into ancillary accommodation.
To heat all the buildings on site, isoenergy installed a 200kW Ecoforest ground source heat pump system. Energy for the heat pump is collected from a large horizontal collector array in a nearby paddock.
Key features:
- 200 kW Ecoforest ground source heat pump
- Horizontal collector array
- 2,000 litre hot water tank
Project gallery