Print this page

Project specification

  • Property type: Commercial
  • Technologies installed:
  • Collector type:
  • Size (kW): 25
  • New/retrofit: Retrofit
  • Brand: CTC

Sedlescombe Vineyard in East Sussex is an environmentally responsible, organic vineyard. When planning their new visitor centre, it made sense to look for sustainable heating options rather than burning fossil fuel to heat the building and staff accommodation.

Isoenergy installed a 25kW CTC ground source heat pump system with energy collected from 1,600m of horizontal collector array in the vineyard.

Key features:

  • 25kw CTC EcoPart i425 heat pump
  • 1,000m horizontal collector array
  • 500 litre hot water tank
  • 500 litre buffer tank

Project gallery

20190220_102140 (1365).jpg 20190220_102159 (1365).jpg 20190822_182542 (1024).jpg

20190927_112431 (1024).jpg 20191024_103117 (1024).jpg

0
0
0
s2smodern