A removals and storage company in Guildford is based in a large warehouse with four south-facing roofs. The owners of the company contacted isoenergy wanting to benefit from the now-cancelled feed-in-tariff before it was too late.
Isoenergy worked with another solar PV installer to ensure the work could be done in such a tight timescale.
A total of 550 panels were installed on the roof and connected to a three-phase power supply for the building. This large roof-top array is expected to generate 143,220 kWh a year, reducing the carbon footprint of the operation whilst making savings on their electricity bill.
Key features: