Harleyford Manor is a Grade 1 listed manor house near the river Thames. isoenergy was selected by M&E consultants E+M Technica to install a new renewable energy system for the house.
Isoenergy installed a 153kW Viessmann ground source heat pump system with energy collected from 21 boreholes.
Key features: