This new marina near Lutterworth, Leicestershire was being built when the owners approached isoenergy to specify a ground source heat pump system that would be able to provide all the special heating and hot water in the main building.
isoenergy specified and installed a ground source heat pump system consisting of two 70-100kW Ecoforest heat pumps. Under the guidance of isoenergy, the client had already installed 3km of collector array on the marina floor.
Key features: